IOC-MIPS_005a |
|
|
|
10120C |
|
|
|
|
Title: |
|
|
Electronics Live Tests |
|
THIS SHOULD BE AN IRS TEMPLATE |
|
|
|
|
|
|
|
|
|
|
|
|
Objective: |
|
|
To confirm that electronics are functional. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description: |
|
|
Turn the CE on and run through a series of tests to make sure commanding, telemetry, |
|
|
|
|
|
|
|
|
etc. are working properly. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Place in Schedule: |
|
|
Telescope does not have to be cold, so this can be done during the initial instrument turn-on and test. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Required Conditions: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Resources: |
|
|
|
|
|
|
|
|
|
duration (best estimate) |
|
|
|
|
1 hour? not sure, have to confirm tests with Ball |
|
|
|
real time downlink (Y / N) |
|
|
|
|
|
|
|
|
special post event actions (Y / N) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Outcome: |
|
|
|
|
|
|
|
|
|
description |
|
|
|
|
|
|
|
|
can proceed in parallel with other activity |
|
|
|
|
|
|
|
|
must outcome be confirmed before next event / test /activity |
|
|
|
|
|
|
|
|
method of confirmation (sensor TLM, data analysis, etc.) |
|
|
|
|
|
|
|
|
estimate of data turn around if required for confirmation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Unique or included in planned uplink or downlink/analysis tool |
|
|
|
|
|
unique |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Contingency Plan: |
|
|
|
|
|
|
|
|
"What if..." |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
IOC Critical |
|
|
|
|
|
Y |
|
|
|
|
|
|
|
|
|
|
|
References: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Template last updated: |
|
|
|
|
|
11-Sep-95 |
|
|
|
|
|
|
|
|
C.W. Engelbracht |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|