IOC-MIOS_025a |
|
|
10210C |
|
|
|
|
Title: |
|
Scan Mirror Operational Test |
|
|
|
|
|
|
|
|
|
|
|
|
|
Objective: |
|
This is a test to ensure that the scan mirror and its position readout are functional. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Description: |
|
We issue a series of CESCANPOS commands and monitor the telemetry |
|
|
|
|
|
|
|
and compare the results to ground testing |
|
|
|
|
|
|
|
|
|
|
|
|
|
Place in Schedule: |
|
during initial electronics checkout |
|
|
|
|
|
|
|
|
|
|
|
|
|
Required Conditions: |
|
no PCS capabilities are required - CE must be working |
|
|
|
|
|
|
|
|
|
|
|
|
|
Resources: |
|
|
|
|
|
|
|
|
duration (best estimate) |
|
|
|
|
1 minute |
|
|
real time downlink (Y / N) |
|
|
|
|
n |
|
|
special post event actions (Y / N) |
|
|
|
|
none |
|
|
|
|
|
|
|
|
|
Outcome: |
|
|
|
|
|
|
|
|
description |
|
|
|
|
scan mirror position telemetry |
|
|
can proceed in parallel with other activity |
|
|
|
|
yes |
|
|
must outcome be confirmed before next event / test /activity |
|
|
|
|
we can't use the CSMM until we confirm it's working |
|
|
method of confirmation (sensor TLM, data analysis, etc.) |
|
|
|
|
telemetry analysis |
|
|
estimate of data turn around if required for confirmation |
|
|
|
|
|
|
|
number of DCEs |
|
|
|
|
0 |
|
|
|
|
|
|
|
|
|
Unique or included in planned uplink or downlink/analysis tool |
|
|
|
|
|
unique |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Contingency Plan: |
|
|
|
|
|
|
|
"What if..." |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
IOC Critical |
|
|
|
|
|
Y |
|
|
|
|
|
|
|
|
|
References: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Template last updated: |
|
|
|
|
|
11-Sep-95 |
|
|
|
|
|
|
|
C.W. Engelbracht |
|
|
|
|
|
|
|
|
|