IOC-MIPS_030a |
|
|
|
10210C |
|
|
|
|
Title: |
|
|
Heaters, Temperature Sensors |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Objective: |
|
|
To confirm that the detector temperature profile after an anneal is as expected. |
|
|
|
|
|
|
|
|
Also, this verifies that the heaters and temperature sensors are working. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description: |
|
|
This is a short test to determine that the detector response to heating is the |
|
|
|
|
|
|
|
|
same as during ground tests and that there is no more than the expected interaction between the detectors. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Place in Schedule: |
|
|
The telescope does not have to be cold for this test, so it can be done during the |
|
|
|
|
|
|
|
|
initial electronic check-out of the instrument. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Required Conditions: |
|
|
PCS pointing and stability are not at all critical |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Resources: |
|
|
|
|
|
|
|
|
|
duration (best estimate) |
|
|
|
|
5 minutes |
|
|
|
real time downlink (Y / N) |
|
|
|
|
n |
|
|
|
special post event actions (Y / N) |
|
|
|
|
data must be analyzed |
|
|
|
|
|
|
|
|
|
|
|
Outcome: |
|
|
|
|
|
|
|
|
|
description |
|
|
|
|
generates temperature telemetry |
|
|
|
can proceed in parallel with other activity |
|
|
|
|
yes |
|
|
|
must outcome be confirmed before next event / test /activity |
|
|
|
|
no |
|
|
|
method of confirmation (sensor TLM, data analysis, etc.) |
|
|
|
|
analysis |
|
|
|
estimate of data turn around if required for confirmation |
|
|
|
|
|
|
|
|
number of DCEs |
|
|
|
|
0 |
|
|
|
|
|
|
|
|
|
|
|
Unique or included in planned uplink or downlink/analysis tool |
|
|
|
|
|
can use anneal IET |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Contingency Plan: |
|
|
|
|
|
|
|
|
"What if..." |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
IOC Critical |
|
|
|
|
|
Y |
|
|
|
|
|
|
|
|
|
|
|
References: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Template last updated: |
|
|
|
|
|
11-Sep-95 |
|
|
|
|
|
|
|
|
C.W. Engelbracht |
|
|
|
|
|
|
|
|
|
|
|