IOC-MIPS_115a |
|
|
|
10180C |
|
|
|
|
|
Title: |
|
|
MIPS 24um Detector Response to Stimulators |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Objective: |
|
|
Demonstrate that the MIPS arrays respond to stimulators being turned on. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description: |
|
|
A series of integrations will be taken with the stimulators both off and on. |
|
|
|
|
|
|
including flow / state diagram |
|
|
Observe for 10 10-second exposures with 24um array. Turn on stimulator and repeat exposure pattern. |
|
|
|
|
|
|
|
|
|
Whenever stimulators are turned on in this test their voltages and currents should be monitored. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Place in Schedule: |
|
|
After aperture has been opened. |
|
|
|
|
|
|
(relative to water shed events) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Required Conditions: |
|
|
MIPS detector aliveness tests must have been performed. |
|
|
|
|
|
|
|
|
|
Backgrounds must be less than the equivalent of 10,000 photons/sec: |
|
|
|
|
|
|
|
|
|
24um test at |
2.00E-05 |
W/m^2/sr |
|
|
|
|
|
|
|
or T<35K |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Resources: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
duration (best estimate) |
|
|
|
|
20min |
|
|
|
|
real time downlink (Y / N) |
|
|
|
|
No |
|
|
|
|
special post event actions (Y / N) |
|
|
|
|
No |
|
|
|
|
Generates 20 DCEs. |
|
|
|
|
|
|
|
|
Outcome: |
|
|
|
|
|
|
|
|
|
|
description |
|
|
|
|
Confirmation that stimulators can be detected. |
|
|
|
|
can proceed in parallel with other activity |
|
|
|
|
Yes |
|
|
|
|
must outcome be confirmed before next event / test /activity |
|
|
|
|
No |
|
|
|
|
method of confirmation (sensor TLM, data analysis, etc.) |
|
|
|
|
Data analysis and sensor TLM |
|
|
|
|
estimate of data turn around if required for confirmation |
|
|
|
|
N/A |
|
|
|
|
|
|
|
|
|
|
|
|
|
Unique or included in planned AOT? |
|
|
|
Unique. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Contingency Plan: |
|
|
|
|
|
|
|
|
|
"What if..." |
|
|
If stimulator output is not detected but telemtry indicates that they turned on, the test will |
|
|
|
|
|
|
|
|
|
need to be repeated using the redundant stimulators |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
IOC Critical |
|
|
Y |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
References: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Template last updated: |
|
|
9/10/99 |
|
|
|
|
|
|
|
|
|
M. Rieke |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|