IOC-MIPS_140a |
|
|
New -- no sci req |
Title: |
|
MIPS SED mode slit profile |
|
|
|
|
|
Objective: |
|
To determine the position and profile
of the SED mode slit. |
|
|
|
|
|
Description: |
|
Place a bright star on the SED slit.
Step the scan mirror in 1/2 pixel steps (5") for a total of 15 steps (75")
while performing the SED |
|
|
|
AOT after each step. Integrate for a
total of about 2 min in each AOT. |
|
|
|
|
|
Place in Schedule: |
|
After dust cover off |
|
|
|
|
|
|
|
|
|
Required Conditions: |
|
S/C pointing understood to <5" (TBR)
and stable to <0.5" (TBR) |
|
|
|
For 70 um performance, the backgrd radiance
must be less than 1.0E-12 W/cm2/sr (< 12 K). |
|
|
|
Need bright stars in the OPZ. a
Boo and e Car are
possibilities for a December launch date. |
|
|
|
|
|
Resources: |
|
|
|
|
duration (best estimate) |
40 min |
|
|
real time downlink |
No |
|
|
special post event actions |
No |
|
|
|
|
|
Outcome: |
|
|
|
|
description |
|
1D map of SED slit and position of slit
relative to PCRS. |
|
can proceed in parallel with other
activity |
|
No, dedicated observing. |
|
must outcome be confirmed before
next event / test /activity |
|
No, except yes before any further SED
activities. |
|
method of confirmation (sensor TLM,
data analysis, etc.) |
|
Data analysis |
|
estimate of data turn around if required
for confirmation |
|
|
|
|
|
|
Unique or included in planned uplink
or downlink/analysis tool |
|
|
AOT and special IET |
|
|
|
|
Contingency Plan: |
|
Repeat, increasing range of scanning
mirror and/or integration time. |
|
|
|
|
|
IOC Critical |
|
N |
|
|
|
|
|
References: |
|
|
|
|
|
|
|
Template last updated: |
|
9/14/99; J. Keene |
|
|
|
|
|
Comments: |
|
Since
the SED mode will not be immediately released, this test can be delayed
until after IOC. |
|
|
|
Part of this test may be done in the
Focal Plane survey. |
|
|
|
|
|
|
|
|
|
|
|
|
|