MIPS_275a Verify pipeline Phot


IOC-MIPS_275a     10870C,10760C          
Title:   MIPS Photometry of a Circumstellar Region            
                 
Objective:   Initial validation of Phot/SR AOT. Verify scientific validity of MIPS Photometry pipeline products and ERO            
                 
Description:   Acquire normal photometry observations of an available stellar remnant with < 2' spatial extent.            
      30s @ 24 microns (1 cycle), 10s @ 70 and 160 microns (4 cycles each),          
      small field, course scale @ 70 microns. Note: far-IR fluxes are not well known.          
                 
    Can be the same as:   Evaluate fully supported AOTs (MIPS Photometry)        
        ERO: Press release observation        
                 
Place in Schedule:   After aperture door open            
    After CTA/instrument cool down and all other instrument testing is complete.            
    For 160um, the backgrd radiance must be less than 5.4E-13 W/cm2/sr (< 6 - 7 K).            
    After MIPS functionality testing is complete.            
    Can be concurrent with other AOT/instrument tests.            
                 
Required Conditions:   CTA and instrument at nominal operating temperature for 160 micron band (mirror at 6 K).            
    PCS performance: 10 arcsec pointing and nominal offsetting            
                 
Resources:                
                 
  duration (best estimate)         0.75 hrs    
  real time downlink (Y / N)         No    
  special post event actions (Y / N)         No    
                 
Outcome:                
  description         Fully calibrated MIPS Photometry data products in three bands.    
  can proceed in parallel with other activity         No - dedicated observing    
  must outcome be confirmed before next event / test /activity         No    
  method of confirmation (sensor TLM, data analysis, etc.)         Data analysis    
  estimate of data turn around if required for confirmation         48 hrs    
                 
Unique or included in planned uplink or downlink/analysis tool           Standard pipeline system and standard data analysis tools required.    
            MIPS Photometry AOT required for uplink.    
                 
Contingency Plan:           Revisit pipeline and/or AOT design depending on the nature of failure.    
"What if..."                
                 
IOC Critical           No    
                 
References:                
                 
Template last updated:           6-Sep-99    
Template written by:           William B. Latter    
                 
                 


Last Updated on 10/7/99
By Marcia Rieke