MIPS_290a Verify pipeline Scn(2)


IOC-MIPS_290a     18870C,10760C,10770C,10530C          
Title:   MIPS Scan Map of the HH 7-11 Region            
    Note: This region has very bright IR sources -- this test can investigate how much of an impact there will be in an AOR.          
                 
Objective:   Verify scientific validity of MIPS Scan pipeline products and ERO            
                 
Description:   Acquire normal scan map observations of the HH 7-11 region over a field 1.0 degree square field.            
      Fast scan rate, 60 arcminute square field, 5 arcmin leg offsets, 4 cycles          
                 
    Can be the same as:   Evaluate fully supported AOTs (MIPS Scan)        
        ERO: Press release observation        
                 
Place in Schedule:   After apertrue door open            
    After CTA/instrument cool down and all other instrument testing is complete.            
    For 160um, the backgrd radiance must be less than 5.4E-13 W/cm2/sr (< 6 - 7 K).            
    After Scan AOT functionality testing is complete.            
    Can be concurrent with other AOT/instrument tests.            
                 
Required Conditions:   CTA and instrument at nominal operating temperature for 160 micron band (mirror at 6 K).            
    PCS performance: 10 arcsec pointing and nominal offsetting and scan stability            
                 
Resources:                
                 
  duration (best estimate)         3.0 hrs    
  real time downlink (Y / N)         No    
  special post event actions (Y / N)         No    
                 
Outcome:                
  description         Fully calibrated MIPS scan map data products in three bands.    
  can proceed in parallel with other activity         No - dedicated observing    
  must outcome be confirmed before next event / test /activity         No    
  method of confirmation (sensor TLM, data analysis, etc.)         Data analysis    
  estimate of data turn around if required for confirmation         48 hrs    
                 
Unique or included in planned uplink or downlink/analysis tool           Standard pipeline system and standard data analysis tools required.    
            MIPS Scan AOT required for uplink.    
                 
Contingency Plan:           Revisit pipeline and/or AOT design depending on the nature of failure.    
"What if..."                
                 
IOC Critical           No    
                 
References:                
                 
Template last updated:           2-Sep-99    
Template written by:           William B. Latter    
                 
                 


Last Updated on 10/7/99
By Marcia Rieke
Email: mrieke@as.arizona.edu