IOC-MIPS_295a |
|
|
10870C,10760C,10770C |
|
|
|
|
|
|
Title: |
|
MIPS Scan Map of M 31 (or M33) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Objective: |
|
Verify scientific validity of MIPS Scan pipeline products and ERO. Test a long AOR. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description: |
|
Acquire normal scan map observations of a 1.5 degree square region covering most of the M 31 galaxy. |
|
|
|
|
|
|
|
|
|
|
Medium scan rate, 90 arcminute square field, 2.5 arcmin leg offsets, 1 cycle. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Can be the same as: |
|
Evaluate fully supported AOTs (MIPS Scan) |
|
|
|
|
|
|
|
|
|
ERO: Press release observation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Place in Schedule: |
|
After aperture door open |
|
|
|
|
|
|
|
|
|
After CTA/instrument cool down and all other instrument testing is complete. |
|
|
|
|
|
|
|
|
|
For 160um, the backgrd radiance must be less than 5.4E-13 W/cm2/sr (< 6 - 7 K). |
|
|
|
|
|
|
|
|
|
After Scan AOT functionality testing is complete. |
|
|
|
|
|
|
|
|
|
Can be concurrent with other AOT/instrument tests. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Required Conditions: |
|
CTA and instrument at nominal operating temperature for 160 micron band (mirror at 6 K). |
|
|
|
|
|
|
|
|
|
PCS performance: 20 arcsec pointing and nominal offsetting and scan stability |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Resources: |
|
|
|
|
|
|
|
|
|
|
duration (best estimate) |
|
|
|
|
8.5 hrs |
|
|
|
|
real time downlink (Y / N) |
|
|
|
|
No |
|
|
|
|
special post event actions (Y / N) |
|
|
|
|
No |
|
|
|
|
|
|
|
|
|
|
|
|
|
Outcome: |
|
|
|
|
|
|
|
|
|
|
description |
|
|
|
|
Fully calibrated MIPS scan map data products in three bands. |
|
|
|
|
can proceed in parallel with other activity |
|
|
|
|
No - dedicated observing |
|
|
|
|
must outcome be confirmed before next event / test /activity |
|
|
|
|
No |
|
|
|
|
method of confirmation (sensor TLM, data analysis, etc.) |
|
|
|
|
Data analysis |
|
|
|
|
estimate of data turn around if required for confirmation |
|
|
|
|
48 hrs |
|
|
|
|
|
|
|
|
|
|
|
|
|
Unique or included in planned uplink or downlink/analysis tool |
|
|
|
|
|
Standard pipeline system and standard data analysis tools required. |
|
|
|
|
|
|
|
|
|
MIPS Scan AOT required for uplink. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Contingency Plan: |
|
|
|
|
|
Revisit pipeline and/or AOT design depending on the nature of failure. |
|
|
|
"What if..." |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
IOC Critical |
|
|
|
|
|
No |
|
|
|
|
|
|
|
|
|
|
|
|
|
References: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Template last updated: |
|
|
|
|
|
6-Sep-99 |
|
|
|
Template written by: |
|
|
|
|
|
William B. Latter |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|