MIPS_300a Validate Params SED


IOC-MIPS_300a     10740C,10830C,10840C,10850C,10860C,10870C,10770C          
Title:   MIPS Spectral Energy Distribution Skeleton AOT Validation            
                 
Objective:   Explore MIPS SED AOT parameter space            
                 
Description:   Execute MIPS SED AOT for all available selectable parameters, or a sensible range.            
                 
    Can be the same as:   Select final operational parameters        
        Tune IPP file as needed        
        ERO -- SED        
        Verify Pipeline -- SED        
                 
    Several AORs will be constructed that will have :            
      1) Run an AOR for each of the 3 available exposure times, each at a different offset distance          
      2) Run an AOR for each of the additional three available offsets at 10 second exposure times.          
      3) Run 3 cycles for each AOR in #1.          
                 
Place in Schedule:   After aperture door open            
    After CTA/instrument cool down:            
    For 70um, the backgrd radiance must be less than 1.0E-12 W/cm2/sr (< 12 K).            
    Location of MIPS apertures must be completed.            
    Basic instrument commanding and functionality must have been confirmed.            
    After initial SED skeleton AOT testing is complete.            
    Before final operational parameters are set and instrument tuning complete.            
                 
Required Conditions:   CTA and instrument at nominal operational temperature.            
    PCS performance:   Absolute pointing 5 arcsec        
        Offsetting nominal        
                 
Resources:                
                 
  duration (best estimate)         1.5 hr    
  real time downlink (Y / N)         No    
  special post event actions (Y / N)         No    
                 
Outcome:                
  description         Perform observations using every selectable parameter available in    
            the AOT, and doing multiple repeats of the sequences.    
  can proceed in parallel with other activity         No, dedicated observing.    
  must outcome be confirmed before next event / test /activity         No    
  method of confirmation (sensor TLM, data analysis, etc.)         Data analysis    
  estimate of data turn around if required for confirmation         48 hrs    
                 
Unique or included in planned uplink or downlink/analysis tool           Standard pipeline if available for skeleton AOT and data analysis tools.    
            MIPS SED skeleton AOT required    
                 
Contingency Plan:           Revisit uplink sequence/command expansion, or AOT design.    
"What if..."                
                 
IOC Critical           Yes    
                 
References:                
                 
Template last updated:           1-Sep-99    
Template written by:           William B. Latter    
                 
                 


Last Updated on 10/7/99
By Marcia Rieke