IOC-MIPS_325a |
|
|
10740C,10830C,10840C,10850C,10860C |
|
|
|
|
|
|
|
Title: |
|
MIPS Scan AOT Validation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Objective: |
|
Explore MIPS Scan AOT parameter space |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description: |
|
Execute MIPS Scan AOTs for all available selectable parameters, or a sensible range. |
|
|
|
|
|
|
|
|
|
|
Not all scan lengths need be tested -- do minimum, maximum, and several intermediate. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Can be the test same as: |
|
Select final operational parameters |
|
|
|
|
|
|
|
|
|
|
Tune IPP file as needed |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Several AORs will be constructed using each scan rate that will have : |
|
|
|
|
|
|
|
|
|
|
|
1) one forward and reverse minimum length scan legs for each of four available offsets (all scan rates) |
|
|
|
|
|
|
|
|
|
|
2) one forward and reverse maximum length scan legs for mimimum and maximum offsets (fast rate only) |
|
|
|
|
|
|
|
|
|
|
3) one X six forward and reverse medium length scan legs at two of four available offsets (fast rate only) |
|
|
|
|
|
|
|
|
|
|
4) do one instance of 1 for 3 cycles (slow rate only) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Place in Schedule: |
|
After aperture door open |
|
|
|
|
|
|
|
|
|
|
After CTA/instrument cool down: |
|
|
|
|
|
|
|
|
|
|
For 24um, the backgrd radiance must be less than 1.0E-11 W/cm2/sr (< 30K). |
|
|
|
|
|
|
|
|
|
|
For 70um, the backgrd radiance must be less than 1.0E-12 W/cm2/sr (< 12 K). |
|
|
|
|
|
|
|
|
|
|
For 160um, the backgrd radiance must be less than 5.4E-13 W/cm2/sr (< 6 K). |
|
|
|
|
|
|
|
|
|
|
It may be possible to split this test into parts executed at different times based |
|
|
|
|
|
|
|
|
|
|
on telescope temperature, but mapping in all three bands is optimal use of time. |
|
|
|
|
|
|
|
|
|
|
Location of MIPS apertures must be completed. |
|
|
|
|
|
|
|
|
|
|
Basic instrument commanding and functionality must have been confirmed. |
|
|
|
|
|
|
|
|
|
|
After initial Scan AOT testing is complete. |
|
|
|
|
|
|
|
|
|
|
Before final operational parameters are set and instrument tuning complete. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Required Conditions: |
|
CTA and instrument at nominal operational temperature. |
|
|
|
|
|
|
|
|
|
|
PCS performance: |
|
Absolute pointing 10 arcsecs |
|
|
|
|
|
|
|
|
|
|
Scan stability nominal |
|
|
|
|
|
|
|
|
|
|
Offsetting nominal |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Resources: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
duration (best estimate) |
|
|
|
|
9.5 hrs |
|
|
|
|
|
real time downlink (Y / N) |
|
|
|
|
No |
|
|
|
|
|
special post event actions (Y / N) |
|
|
|
|
No |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Outcome: |
|
|
|
|
|
|
|
|
|
|
|
description |
|
|
|
|
Several scans at minimum, maximum, and intermediate lengths, each |
|
|
|
|
|
|
|
|
|
|
using all three scan rates. Also, several small maps of varying numbers of |
|
|
|
|
|
|
|
|
|
|
legs, cross scan offsets, and map cycles. |
|
|
|
|
|
can proceed in parallel with other activity |
|
|
|
|
No, dedicated observing. |
|
|
|
|
|
must outcome be confirmed before next event / test /activity |
|
|
|
|
No |
|
|
|
|
|
method of confirmation (sensor TLM, data analysis, etc.) |
|
|
|
|
Data analysis |
|
|
|
|
|
estimate of data turn around if required for confirmation |
|
|
|
|
48 hrs |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Unique or included in planned uplink or downlink/analysis tool |
|
|
|
|
|
Standard pipeline and data analysis tools. |
|
|
|
|
|
|
|
|
|
|
MIPS Scan AOT required |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Contingency Plan: |
|
|
|
|
|
Revisit uplink sequence/command expansion, or AOT design. |
|
|
|
|
"What if..." |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
IOC Critical |
|
|
|
|
|
Yes |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
References: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Template last updated: |
|
|
|
|
|
29-Aug-99 |
|
|
|
|
Template written by: |
|
|
|
|
|
William B. Latter |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|