MIPS_330a Validate Params TPM


IOC-MIPS_330a     10740C,10830C,10840C,10850C,10860C,10870C,10770C          
Title:   MIPS Total Power Mode Skeleton AOT Validation            
                 
Objective:   Explore MIPS TPM AOT parameter space            
                 
Description:   Execute MIPS TPM AOT for all available selectable parameters, or a sensible range.            
                 
    Can be the same as:   Select final operational parameters        
        Tune IPP file as needed        
        ERO -- TPM        
        Verify Pipeline -- TPM        
                 
    Several AORs will be constructed that will have :            
      1) Standard mode TPM AOR -- 3 bands          
      2) Five cycles at 3 and 30 seconds exposures - one band          
      3) 1, 3, and 7 cycles at 10 second exposure time -- one band          
                 
Place in Schedule:   After aperture door open            
    After CTA/instrument cool down:            
    For 24um, the backgrd radiance must be less than 1.0E-11 W/cm2/sr (< 30K).            
    For 70um, the backgrd radiance must be less than 1.0E-12 W/cm2/sr (< 12 K).            
    For 160um, the backgrd radiance must be less than 5.4E-13 W/cm2/sr (< 6 K).            
    It may be possible to split this test into parts executed at different times based            
    on telescope temperature, but simultaneous use of all three bands is a better use of time.            
    Location of MIPS apertures must be completed.            
    Basic instrument commanding and functionality must have been confirmed.            
    After initial TPM skeleton AOT testing is complete.            
    Before final operational parameters are set and instrument tuning complete.            
                 
Required Conditions:   CTA and instrument at nominal operational temperature.            
    PCS performance:   Minimal PCS peformance required.        
                 
Resources:                
                 
  duration (best estimate)         0.7 hr    
  real time downlink (Y / N)         No    
  special post event actions (Y / N)         No    
                 
Outcome:                
  description         Perform observations using every selectable parameter available in    
            the AOT, and doing multiple repeats of the sequences.    
  can proceed in parallel with other activity         No, dedicated observing.    
  must outcome be confirmed before next event / test /activity         No    
  method of confirmation (sensor TLM, data analysis, etc.)         Data analysis    
  estimate of data turn around if required for confirmation         48 hrs    
                 
Unique or included in planned uplink or downlink/analysis tool           Standard pipeline if available for skeleton AOT and data analysis tools.    
            MIPS TPM skeleton AOT required    
                 
Contingency Plan:           Revisit uplink sequence/command expansion, or AOT design.    
"What if..."                
                 
IOC Critical           Yes    
                 
References:                
                 
Template last updated:           1-Sep-99    
Template written by:           William B. Latter    
                 
                 
                 


Last Updated on 10/7/99
By Marcia Rieke