MIPS_355a MIPS Cluster Test


IOC-MIPS_355a     10740C          
Title:   MIPS AOT Cluster Option Validation            
                 
Objective:   Verify that the cluster option is implemented correctly for all MIPS AOTs.            
                 
Description:   Take a series of observations of sources defined in the cluster option for the            
    MIPS Photometry/SuperRes and SED AOTs.            
      Phot/SR and SED AOTs of minimum length at several cluster option positions and all cluster options          
      Phot/SR: 24 um FOV only, 3 second exposures, small field, 1 cycle per cluster position          
      SED: 3 second exposures, minimum chop, 1 cycle per cluster position          
                 
Place in Schedule:   After aperture door open            
    After CTA/instrument cool down to a level where bright stars can be seen:            
    For 24um, bakground must be less than 4.0e-10 W/cm^2/sr (< 37 K).            
    For 70um, background must be less than 1.2e-10 W/m^2/sr (< 16 K).            
    For 160um, bakcgound must be less than 5.3e-11 W/m^2/sr (< < 8.5 K).            
    Data acquizition in the 24 um band only is sufficient for this test.            
    Basic instrument commanding and functionality must have been confirmed.            
    After initial Phot/SR and SED AOT basic testing is complete.            
                 
Required Conditions:   CTA and instrument at nominal operational temperature.            
    PCS performance: 10 arcsec pointing and nominal offsetting            
                 
Resources:                
  duration (best estimate)         0.75 hrs    
  real time downlink (Y / N)         No    
  special post event actions (Y / N)         No    
                 
Outcome:                
  description         Several positions in the Phot/SR and SED AOTs will be executed.    
            Standard data products will result.    
  can proceed in parallel with other activity         No, dedicated observing.    
  must outcome be confirmed before next event / test /activity         No    
  method of confirmation (sensor TLM, data analysis, etc.)         Data analysis    
  estimate of data turn around if required for confirmation         48 hrs    
                 
Unique or included in planned uplink or downlink/analysis tool           Standard pipeline and data analysis tools.    
            MIPS Phot/SR ans SED skeleton AOT required    
                 
Contingency Plan:           Revisit cluster option design.    
"What if..."                
                 
IOC Critical           Yes    
                 
References:                
                 
Template last updated:           6-Sep-99    
Template written by:           William B. Latter    
                 
                 


Last Updated on 10/7/99
By Marcia Rieke