| IOC-MIPS_015a | 10510C,10130C,10500C | |||||||
| Title: | MIPS Combined Electronics State Validation and Functional Tests | |||||||
| Objective: | Verify that the combined electronics states are all active and functioning. | |||||||
| Description: | The Combined Electronics will be commanded to all safely available states and test diagnostics run (TBD) | |||||||
| to validate the CE in all MIPS modes -- | PDDU Off | |||||||
| TPG test - run TPG self-test | ||||||||
| OFF | ||||||||
| BOOT | ||||||||
| SUSPEND | ||||||||
| OPERATE | EDAC test - transition to OPERATE, run EDAC self-test | |||||||
| Ge Control Test - transition to MIPS Observe, transition to Photometry mode, take 2 MIPS Raw | ||||||||
| exposures with chopping, check flat and flood stimulators | ||||||||
| MIPS READY | ||||||||
| MIPS OBSERVE | ||||||||
| Place in Schedule: | After MIPS Aliveness check and CE EEPROM test. | |||||||
| Required Conditions: | None. | |||||||
| Resources: | ||||||||
| duration (best estimate) | 1.0 hrs | |||||||
| real time downlink (Y / N) | Yes | |||||||
| special post event actions (Y / N) | No | |||||||
| Outcome: | ||||||||
| description | CE diagnostic data confirming state transitions and validity. | |||||||
| can proceed in parallel with other activity | Yes | |||||||
| must outcome be confirmed before next event / test /activity | Yes | |||||||
| method of confirmation (sensor TLM, data analysis, etc.) | TLM diagnostic data | |||||||
| estimate of data turn around if required for confirmation | 6 hrs | |||||||
| Unique or included in planned uplink or downlink/analysis tool | Unique. | |||||||
| Contingency Plan: | Find CE software bug and reload flight software. | |||||||
| "What if..." | ||||||||
| IOC Critical | Yes | |||||||
| Data Volume: | None -- RT telemetry | |||||||
| References: | ||||||||
| Template last updated: | 6-Sep-99 | |||||||
| Template written by: | William B. Latter | |||||||