| IOC-MIPS_270a | 10750C | |||||||
| Title: | MIPS Total Power Measurement at the Ecliptic Pole. | |||||||
| Objective: | Evaluate skeleton AOT -- MIPS TPM | |||||||
| Description: | Acquire normal TPM observations of a nominally dark region -- the ecliptic pole. | |||||||
| This observation will test the AOT and determine how dark the inside of the instrument | ||||||||
| actually is at 160 um, evaluating the utility of this mode at 160 um. | ||||||||
| Standard mode TPM AOR repeated until required S/N is achieved. | ||||||||
| Can be the same as: | Verify pipeline -- TPM | |||||||
| Place in Schedule: | After aperture door open | |||||||
| After CTA/instrument cool down and all other instrument testing is complete. | ||||||||
| For 24um, the backgrd radiance must be less than 1.0E-11 W/cm2/sr (< 30K). | ||||||||
| For 70um, the backgrd radiance must be less than 1.0E-12 W/cm2/sr (< 12 K). | ||||||||
| For 160um, the backgrd radiance must be less than 5.4E-13 W/cm2/sr (< 6 K). | ||||||||
| It may be possible to split this test into parts executed a different times based | ||||||||
| on telescope temperature, but simultaneous use of all three bands is a better use of time. | ||||||||
| Location of MIPS apertures must be completed. | ||||||||
| Can be concurrent with other AOT/instrument tests. | ||||||||
| Required Conditions: | CTA and instrument at nominal operating temperature for the 160 um band (< 6 K). | |||||||
| PCS performance: | Minimal PCS peformance required. | |||||||
| Resources: | ||||||||
| duration (best estimate) | 40 minutes | |||||||
| real time downlink (Y / N) | No | |||||||
| special post event actions (Y / N) | No | |||||||
| Outcome: | ||||||||
| description | Fully calibrated MIPS TPM data products in three bands, or | |||||||
| whatever is available from skeleton pipeline. | ||||||||
| can proceed in parallel with other activity | No - dedicated observing | |||||||
| must outcome be confirmed before next event / test /activity | No | |||||||
| method of confirmation (sensor TLM, data analysis, etc.) | Data analysis | |||||||
| estimate of data turn around if required for confirmation | 48 hrs | |||||||
| Unique or included in planned uplink or downlink/analysis tool | Standard pipeline system and standard data analysis tools required. | |||||||
| MIPS skeleton TPM AOT required for uplink. | ||||||||
| Contingency Plan: | Revisit pipeline and/or AOT design depending on the nature of failure. | |||||||
| "What if..." | ||||||||
| IOC Critical | Yes | |||||||
| References: | ||||||||
| Template last updated: | 6-Sep-99 | |||||||
| Template written by: | William B. Latter | |||||||