| CAID: MIPS-139 | Title: SED Slit Location & Geometry (Coarse Survey) | |
| System: MIPS | Principal: jkeene | Deputy: |
| Objective: | To determine in the position and orientation of the SED slit relative to the PCRS. |
| Description: | Put the CSMM in its nominal SED position to direct the light from a bright 70um source into the SED optical train. Step the image across across the slit by moving the S/C in 1/2 pixel steps (5") for a total of 2' (24 steps and 25 integrations). Use the CSSM to chop 2' off source (more if possible). Integrate 3 sec each on and off source at each position. Repeat at 5 positions along the slit. Insert each scan above within standard FPS "PCRS sandwich" measurements. |
| Day: 48.3944444444496 | Suggested Order: I200 | ||
| Must be preceded by these activities (list by CAID): MIPS-132 | |||
| Place in Schedule: | |||
| Priority: Critical | |||
Conditions | |||
| Maximum telescope temperature: | 12 K | ||
| Minimum telescope temperature: | 5.5 K | ||
| Should activity be repeated if focus changes? | No Repeat if focus changes by 0 mm | ||
| Maximum absolute pointing uncertainty: | 3 arcsec (1 sigma radial) | ||
| Maximum precision offset uncertainty: | 1 arcsec (1 sigma radial) | ||
| Observatory configuration: | standard | ||
| Go/No Go criteria: | CSMM, CE nominal | ||
Duration: 108 minutes
| | Real time downlink:
 
No | | |||
| Data Volume (uncompressed): 0 Mbits | |||
| List Blocks, AORs, SERs, IERs, or unique sequences required (uplink): SED_Map IER (JAS) | |||
| List Analysis tools required (downlink): pipeline output. IT tool to measure spectral brightness and log it vs. CSMM position. | |||
| Estimate of data turn around: 60 hours | |||
| Description: Brightest spectrum vs. CSMM position determined for both spacecraft pointings. | |||
| Can proceed in parallel with other activity: No | |||
| Must outcome be confirmed before next activity: No | |||
| Method of Confirmation: Data analysis, CSMM TLM. | |||
| Success criteria: Source spectrum appears for some CSMM position at both spacecraft pointings. | |||
| Contingency plan: Must repeat after determining and correcting pointing problem. | |||
Comments | |||
| References: | |||
|
Additional Comments:
This should be repeated with different IR star. | |||