CAID: MIPS-261 | Title: Read Noise Stability 1 | |
System: MIPS | Principal: kgordon | Deputy: jmuzerolle |
Objective: | The stability of read noise and dark current are measured. This is part 1 of the task and part 2 is MIPS-262. |
Description: | The stability of read noise over time is measured with these three tasks. The stability of the dark current versus time will be measured using the standard dark calibration observations (taken every campaign). The variation of read noise and dark current as a function of time since anneal is measured in MIPS-160. This task and two others (MIPS-160,MIPS-261,MIPS- 262) measure the read noise stability over longer time scales: 1 day and 1 week. The detailed scheduling of these three tasks is not important as along as the combination of the three tasks gives the needed separations. Outline of the Task: This task should use the Read Noise IERs and take the equivelant of the following (10 sec integration). Do a thermal anneal run all the read noise IERs (all exposure times and dark positions) |
Day: 76.6569444444467 | Suggested Order: O025 | ||
Must be preceded by these activities (list by CAID): | |||
Place in Schedule: This task should be done 1 day after MIPS-160. | |||
Priority: Desired | |||
Conditions | |||
Maximum telescope temperature: | 6.5 K | ||
Minimum telescope temperature: | 5.5 K | ||
Should activity be repeated if focus changes? | No Repeat if focus changes by 0 mm | ||
Maximum absolute pointing uncertainty: | 3600 arcsec (1 sigma radial) | ||
Maximum precision offset uncertainty: | 3600 arcsec (1 sigma radial) | ||
Observatory configuration: | Standard | ||
Go/No Go criteria: | Array temperatures must be stable, detectors must be functioning nominally | ||
Duration: 60 minutes
| Real time downlink:
 
No | |
Data Volume (uncompressed): 1216 Mbits | |||
List Blocks, AORs, SERs, IERs, or unique sequences required (uplink): Anneal & Dark IERs | |||
List Analysis tools required (downlink): Standard MIPS data reduction pipeline | |||
Estimate of data turn around: 192 hours | |||
Description: Run data through pipeline. Compute the read noise and compare to the other two related tasks. | |||
Can proceed in parallel with other activity: Yes | |||
Must outcome be confirmed before next activity: No | |||
Method of Confirmation: data analysis | |||
Success criteria: Good measurements of read noise for all three tasks (MIPS-160,261,262). | |||
Contingency plan: If this test fails to execute or if it gives ambiguous answers, the standard 10 second read noise observations can be used. | |||
Comments | |||
References: | |||
Additional Comments:
| |||
This activity last updated: 10/19/2002 6:01:54 PM |