CAID: MIPS-261 Title: Read Noise Stability 1
 
System: MIPS Principal: kgordon Deputy: jmuzerolle
Objective:  
The stability of read noise and dark current 
are 
measured.  This is part 1 of the task  and part 
2 is MIPS-262.
 
Description:
The stability of read noise over time is 
measured with these three tasks.   The
stability of the dark current versus time
will be measured using the standard dark
calibration observations (taken every
campaign).  The variation of read noise 
and dark current as a function of time 
since anneal is measured in MIPS-160. 
This task and two others 
(MIPS-160,MIPS-261,MIPS-
262) measure the read noise stability
over longer time scales: 1 day and 1 week.  
The detailed scheduling of these three tasks
is not important as along as the combination
of the three tasks gives the needed 
separations.

Outline of the Task:
This task should use the Read Noise IERs
and take the equivelant of the following (10 
sec 
integration).

      Do a thermal anneal
run all the read noise IERs (all exposure 
times
and
dark positions)
 
Day:   76.6569444444467 Suggested Order:   O025
 
Must be preceded by these activities (list by CAID):  
 
Place in Schedule:   This task should be done 1 day after MIPS-160.
 
Priority:   Desired


Conditions

Maximum telescope temperature: 6.5 K
 
Minimum telescope temperature: 5.5 K
 
Should activity be repeated if focus changes?   No     Repeat if focus changes by 0 mm
 
Maximum absolute pointing uncertainty: 3600 arcsec (1 sigma radial)
 
Maximum precision offset uncertainty: 3600 arcsec  (1 sigma radial)
 
Observatory configuration: Standard
 
Go/No Go criteria: Array temperatures must be stable, detectors must be functioning nominally


Resources

Duration:   60 minutes
 
Real time downlink:   No   

Data Volume (uncompressed): 1216 Mbits
 
List Blocks, AORs, SERs, IERs, or unique sequences required (uplink): Anneal & Dark IERs
 
List Analysis tools required (downlink):   Standard MIPS data reduction pipeline

Outcome


Estimate of data turn around:   192 hours
 
Description: Run data through pipeline. Compute the read noise and compare to the other two related tasks.
 
Can proceed in parallel with other activity: Yes
 
Must outcome be confirmed before next activity: No
 
Method of Confirmation:   data analysis
 
 
Success criteria: Good measurements of read noise for all three tasks (MIPS-160,261,262).
 
Contingency plan:  If this test fails to execute or if it gives ambiguous answers, the standard 10 second read noise observations can be used.
 
 

Comments

 
References:  
 
Additional Comments:
 
This activity last updated: 10/19/2002 6:01:54 PM