| CAID: MIPS-275 | Title: Photometry of a Circumstellar Disk | |
| System: MIPS | Principal: jstansberry | Deputy: krs |
| Objective: | Initial validation of Phot/SR AOT. Verify scientific validity of MIPS Photometry pipeline products. Cross-calibration with SED observations. Possible ECO. |
| Description: | Acquire normal photometry AOT observations at 24, 70, and 160um of an available, bright, circumstellar disk with < 2' spatial extent. Tailor integration time in each band to insure good S/N in single DCEs (eg. > 5). Use at least 3 cycles in each band regardless of whether that is needed to get the desired S/N in order to verify correct behavior of the observatory and pipeline for multiple cycles. This can serve as an ECO. |
| Day: 61.8006944444496 | Suggested Order: O800 | ||
| Must be preceded by these activities (list by CAID): MIPS-320, MIPS-322, MIPS-324 | |||
| Place in Schedule: After aperture door open MIPS CE and arrays operating normally. After commanding validation of the photometry AOT. | |||
| Priority: Necessary | |||
Conditions | |||
| Maximum telescope temperature: | 6.5 K | ||
| Minimum telescope temperature: | 5.5 K | ||
| Should activity be repeated if focus changes? | No Repeat if focus changes by 0 mm | ||
| Maximum absolute pointing uncertainty: | 3 arcsec (1 sigma radial) | ||
| Maximum precision offset uncertainty: | 1 arcsec (1 sigma radial) | ||
| Observatory configuration: | standard | ||
| Go/No Go criteria: | |||
Duration: 30 minutes
| | Real time downlink:
 
No | | |||
| Data Volume (uncompressed): 336 Mbits | |||
| List Blocks, AORs, SERs, IERs, or unique sequences required (uplink): AOR | |||
| List Analysis tools required (downlink): standard pipeline output. False-color composite desireable for ERO. | |||
| Estimate of data turn around: 8 hours | |||
| Description: Fully calibrated MIPS Photometry data products in three bands. | |||
| Can proceed in parallel with other activity: No | |||
| Must outcome be confirmed before next activity: No | |||
| Method of Confirmation: Data analysis | |||
| Success criteria: good S/N image obtained in all 3 bands, source present in all 3 images. | |||
| Contingency plan: Revisit pipeline and/or AOT design depending on the nature of failure. | |||
Comments | |||
| References: | |||
|
Additional Comments:
the SED activity, which is really a companion to this one, and should follow this one. | |||
| This activity last updated: 7/2/2002 4:15:25 PM | |||