24 µm Scan Map AOT Validation - Preliminary

Principal: Deborah Padgett
Deputy: Marcia Rieke
Data Monkey(s):
Priority: Necessary
Downlink Priority: Normal
Analysis Time: 24 hours
Last Updated:


Objective

Demonstrate that MIPS 24 µm scan map AOT obtains data as expected in a rudamentary fashion.

Description

Execute MIPS scan map AOT for a single set of parameter selections. For the preliminary validation, only fast scan is used.

Data Collected

This task is implemented by commanding two 1-degree-long fast scans offset by 0 arcsec in the cross-scan direction. The exposures are 3 s individually for a total of 30 sec total integration time. The target is NGC 2516 a star cluster with several members bright enough for 24 µm photospheric detection.


#  Please edit this file with care to maintain the
#  correct format so that SPOT can still read it.
#  Generated by SPOT on:  10/22/2002     16:30:30

HEADER: FILE_VERSION=6.2, STATUS = PROPOSAL

      AOT_TYPE:  MIPS Scan Map
     AOR_LABEL:  MIPS-326-fast-2legs-0-0 - ngc 2516-off
    AOR_STATUS:  new

 MOVING_TARGET:  NO
   TARGET_TYPE:  FIXED SINGLE
   TARGET_NAME:  ngc 2516-off
  COORD_SYSTEM:  Equatorial  J2000
      POSITION:  RA_LON=7h58m21.36s,  DEC_LAT=-60d48m54.0s
OBJECT_AVOIDANCE:  EARTH = YES, OTHERS = YES

    REQUIRE_160: YES
      SCAN_RATE: fast
 FAST_RESET_160: NO
      STEP_SIZE: TURNAROUND=0", FORWARD=0"
    N_SCAN_LEGS: 2
   N_MAP_CYCLES: 1
SCAN_LEG_LENGTH: 1.0
MAP_CENTER_OFFSET: CROSS_SCAN = 0, IN_SCAN = 0
SPECIAL: IMPACT = none, LATE_EPHEMERIS = NO,SECOND_LOOK = NO
RESOURCE_EST: TOTAL_DURATION=1031.75, SLEW_TIME=20.6, SETTLE_TIME=45.75, SLEW_OVERHEAD=180.0, SPECIAL_OVERHEAD=0.0, UPLINK_VOLUME=639, DOWNLINK_VOLUME=16918502, VERSION=S6.3.B2
INTEGRATION_TIME: MIPS_24=15.7,MIPS_70=15.7,MIPS_160=3.1






Data Reformatting Requirements

Array Data Desired:

24 µm

Data Reformatting Option: