Campaign V EROs

Principal: G. Rieke
Deputy: E. Young
Data Monkey(s): All
Priority:
Downlink Priority: Normal
Analysis Time: Eternity
Last Updated:


Objective

Pretty pictures.


Description

EROs as of April 2003 - to be replanned.
        LMC HII region He206 (32): Gordon
        Arp 271 (25): No MIPSer (Stolovy?)
        NGC 300 (71): Stolovy?

Data Collected



Data Reformatting Requirements

Array Data Desired:

24 µm, 70 µm, 160 µm, All Arrays

Data Reformatting Option:

Special Instructions:

Task Dependencies


Calibration Dependencies


Output and Deliverable Products


Data Analysis


Software Requirements


Actions Following Analysis


Failure Modes and Responses


Additional Notes