| CAID: MIPS-601 | Title: 160 um Stim and Star Calibration | |
| System: MIPS | Principal: dhines | Deputy: |
| Objective: | Dean - fill this in |
| Description: |
| Day: 0 | Suggested Order: | ||
| Must be preceded by these activities (list by CAID): | |||
| Place in Schedule: | |||
| Priority: Necessary | |||
Conditions | |||
| Maximum telescope temperature: | 300 K | ||
| Minimum telescope temperature: | 5.5 K | ||
| Should activity be repeated if focus changes? | No Repeat if focus changes by 0 mm | ||
| Maximum absolute pointing uncertainty: | 0 arcsec (1 sigma radial) | ||
| Maximum precision offset uncertainty: | 0 arcsec (1 sigma radial) | ||
| Observatory configuration: | |||
| Go/No Go criteria: | |||
Duration: 7 minutes
| | Real time downlink:
 
No | | |||
| Data Volume (uncompressed): 0 Mbits | |||
| List Blocks, AORs, SERs, IERs, or unique sequences required (uplink): | |||
| List Analysis tools required (downlink): | |||
| Estimate of data turn around: 0 hours | |||
| Description: | |||
| Can proceed in parallel with other activity: No | |||
| Must outcome be confirmed before next activity: No | |||
| Method of Confirmation: | |||
| Success criteria: | |||
| Contingency plan: | |||
Comments | |||
| References: | |||
|
Additional Comments:
| |||
| This activity last updated: 6/10/2002 12:03:30 AM | |||