Sequencer Site SIRTF IOC Activity c. 2002

CAID: MIPS-930 Title: Ge Anneal and Recovery
 
System: MIPS Principal: alberto Deputy: 
Objective:  
Activities to be scheduled every three hours as
needed throughout the campaigns.
 
Description:
Ge Anneal - every 3 hours - 
Recovery time: 10 min at 70um ; 4 min at 160um.
 
Day:   33.38 Suggested Order:  
 
Must be preceded by these activities (list by CAID):  
 
Place in Schedule:  
 
Priority:   Necessary


Conditions

Maximum telescope temperature: 300 K
 
Minimum telescope temperature: 5.5 K
 
Should activity be repeated if focus changes?   No     Repeat if focus changes by 0 mm
 
Maximum absolute pointing uncertainty: 0 arcsec (1 sigma radial)
 
Maximum precision offset uncertainty: 0 arcsec  (1 sigma radial)
 
Observatory configuration:
 
Go/No Go criteria:


Resources

Duration:   12 minutes
 
Real time downlink:   No   

Data Volume (uncompressed): 20 Mbits
 
List Blocks, AORs, SERs, IERs, or unique sequences required (uplink):
 
List Analysis tools required (downlink):  

Outcome


Estimate of data turn around:   0 hours
 
Description:
 
Can proceed in parallel with other activity: No
 
Must outcome be confirmed before next activity: No
 
Method of Confirmation:  
 
 
Success criteria:
 
Contingency plan: 
 
 

Comments

 
References:  
 
Additional Comments:
To be scheduled every 3 hours during a campaign, Anneals by themselves *do not* produce a downlink volume. *However* it is very likely that we will monitor the effects of the anneals by taking some data. The estimated volume above ihas been determined by using a series of dark frames (202 DCES 3 sec each).
 
This activity last updated: 6/23/2002 12:13:51 PM