| CAID: MIPS-930 | Title: Ge Anneal and Recovery | |
| System: MIPS | Principal: alberto | Deputy: |
| Objective: | Activities to be scheduled every three hours as needed throughout the campaigns. |
| Description: | Ge Anneal - every 3 hours - Recovery time: 10 min at 70um ; 4 min at 160um. |
| Day: 33.38 | Suggested Order: | ||
| Must be preceded by these activities (list by CAID): | |||
| Place in Schedule: | |||
| Priority: Necessary | |||
Conditions | |||
| Maximum telescope temperature: | 300 K | ||
| Minimum telescope temperature: | 5.5 K | ||
| Should activity be repeated if focus changes? | No Repeat if focus changes by 0 mm | ||
| Maximum absolute pointing uncertainty: | 0 arcsec (1 sigma radial) | ||
| Maximum precision offset uncertainty: | 0 arcsec (1 sigma radial) | ||
| Observatory configuration: | |||
| Go/No Go criteria: | |||
Duration: 12 minutes
| | Real time downlink:
 
No | | |||
| Data Volume (uncompressed): 20 Mbits | |||
| List Blocks, AORs, SERs, IERs, or unique sequences required (uplink): | |||
| List Analysis tools required (downlink): | |||
| Estimate of data turn around: 0 hours | |||
| Description: | |||
| Can proceed in parallel with other activity: No | |||
| Must outcome be confirmed before next activity: No | |||
| Method of Confirmation: | |||
| Success criteria: | |||
| Contingency plan: | |||
Comments | |||
| References: | |||
|
Additional Comments:
To be scheduled every 3 hours during a campaign, Anneals by themselves *do not* produce a downlink volume. *However* it is very likely that we will monitor the effects of the anneals by taking some data. The estimated volume above ihas been determined by using a series of dark frames (202 DCES 3 sec each). | |||
| This activity last updated: 6/23/2002 12:13:51 PM | |||