CAID: MIPS-961 | Title: 70 um WF Frame Table Update Sanity Check | |
System: MIPS | Principal: jkeene | Deputy: |
Objective: | This task will execute one PCRS peakup ier from the IRS PCRS peakup AOT and one short 70 um WF photometry AOT, purely to check if the frame table updates have been made correctly and with the right sign. |
Description: | PCRS peakup IER - 5 min Photometry AOT (3 sec, 1 cycle) -3 min |
Day: 0 | Suggested Order: J100 | ||
Must be preceded by these activities (list by CAID): | |||
Place in Schedule: | |||
Priority: Necessary | |||
Conditions | |||
Maximum telescope temperature: | 12 K | ||
Minimum telescope temperature: | 5.5 K | ||
Should activity be repeated if focus changes? | No Repeat if focus changes by 0 mm | ||
Maximum absolute pointing uncertainty: | 0 arcsec (1 sigma radial) | ||
Maximum precision offset uncertainty: | 0 arcsec (1 sigma radial) | ||
Observatory configuration: | |||
Go/No Go criteria: | |||
Duration: 8 minutes
| Real time downlink:
 
No | |
Data Volume (uncompressed): 4.1 Mbits | |||
List Blocks, AORs, SERs, IERs, or unique sequences required (uplink): 70 um WF photometry AOT | |||
List Analysis tools required (downlink): | |||
Estimate of data turn around: 0 hours | |||
Description: | |||
Can proceed in parallel with other activity: No | |||
Must outcome be confirmed before next activity: No | |||
Method of Confirmation: | |||
Success criteria: | |||
Contingency plan: | |||
Comments | |||
References: | |||
Additional Comments:
| |||
This activity last updated: 6/10/2002 12:21:44 PM |