70µm Narrow Field FPS Candidate Star

Principal: Jocelyn Keene
Deputy: Jane Morrison, Bill Wheaton
Data Monkey(s): Jane Morrison and Bill Wheaton
Priority: Necessary
Downlink Priority: Normal
Analysis Time: 1 day
Last Updated:


Objective

Before carrying out the focal plane survey for 70 µm NF (campaign I), we want to check the suitability of the targets. They should not be saturated, too weak, or obviously extended. The S/N in one 3 sec integration should be good, > 30. We have 2 candidates for the 70 µm narrow field. We will execute 1 small field AOT per source, with 3 sec integrations.

Description


70 um photometry, small source, 1 cycle, 3 sec - 8 min total.
This task is performed in campaign G to check the suitablity of the star to be used to map the focal plane in campaign I. The frame table updates for all the campaigns can be found in the following table:
Frame Table Updates.

Data Collected

One 70 µm photometry AOT


Data Reformatting Requirements

Array Data Desired:

70 µm

Data Reformatting Option:


Task Dependencies


Calibration Dependencies


Output and Deliverable Products


Data Analysis


Software Requirements


Actions Following Analysis


Failure Modes and Responses


Additional Notes