CAID: MIPS-940 | Title: Si Anneal & Stim | |
System: MIPS | Principal: dlp | Deputy: |
Objective: | To be scheduled at least once per day (or per campaign, if shorter than one day). |
Description: | Si Anneal - 2 min Recovery - 5 min Si Stim Flash - 2 min |
Day: 46.13 | Suggested Order: | ||
Must be preceded by these activities (list by CAID): | |||
Place in Schedule: | |||
Priority: Necessary | |||
Conditions | |||
Maximum telescope temperature: | 300 K | ||
Minimum telescope temperature: | 5.5 K | ||
Should activity be repeated if focus changes? | No Repeat if focus changes by 0 mm | ||
Maximum absolute pointing uncertainty: | 0 arcsec (1 sigma radial) | ||
Maximum precision offset uncertainty: | 0 arcsec (1 sigma radial) | ||
Observatory configuration: | |||
Go/No Go criteria: | |||
Duration: 9 minutes
| Real time downlink:
 
No | |
Data Volume (uncompressed): 0 Mbits | |||
List Blocks, AORs, SERs, IERs, or unique sequences required (uplink): | |||
List Analysis tools required (downlink): | |||
Estimate of data turn around: 1 hours | |||
Description: | |||
Can proceed in parallel with other activity: No | |||
Must outcome be confirmed before next activity: No | |||
Method of Confirmation: | |||
Success criteria: | |||
Contingency plan: | |||
Comments | |||
References: | |||
Additional Comments:
To be scheduled at least once per day (or per campaign if shorter than one day). | |||
This activity last updated: 4/19/2002 10:51:29 AM |