24µm Frame Table Updata Sanity Check

Principal: Jocelyn Keene
Deputy: Jane Morrison, Bill Wheaton
Data Monkey(s): Jane Morrison and Bill Wheaton
Priority: Necessary
Downlink Priority: Normal
Analysis Time: 1 day
Last Updated:


Objective

This task will execute one PCRS peakup IER from the IRS peakup AOT and one short 24 µm photometry AOT for a compact source, purely to check if the frame table updates have been makde correctly and with the correct sign.

Description

One PCRS peakup IER from the IRS peakup AOT: 5 minutes.
24 µm Photometry AOT for a compact source (3 sec, 1 cycle) 5 minutes.
This task is performed in campaign H to check the results from MIPS_130 task (24 µm coarse FPS) done in campaigns F and G whose results went into FTU 9. The frame table updates for all the campaigns can be found in the following table:
Frame Table Updates.

Data Collected

One 24 µm photometry AOT


Data Reformatting Requirements

Array Data Desired:

24 µm

Data Reformatting Option:


Task Dependencies


Calibration Dependencies


Output and Deliverable Products


Data Analysis